AEP signed 15 gigawatts of new load in one quarter. Who pays for the grid: large-load tariffs in the utilities' own filings
Every utility figure and quotation below was read from the companies' own filings on sec.gov and is cited with its accession: the September-quarter 10-Qs and the third-quarter releases furnished on Form 8-K. State commission orders, grid-operator reports and FERC releases are public records, not SEC filings. We label them reported and link the primary record. Differences and sums are our arithmetic and are marked (Ours.) Research, not investment advice.
If you pay an electricity bill in Virginia, Ohio, Georgia or Texas, a data center is now a line
in your utility's quarterly report. Dominion Energy reports a revenue class it calls "High load".
In the third quarter it brought in $706 million, against $503 million a year earlier (10-Q
0001193125-26-440697). (Ours: up 40%.) The class is defined as "customers in Virginia,
including certain data centers, with actual or anticipated forecast demand of 25 MW or higher and
annual load factor of 75% or higher."
The grid those customers need is built before they arrive and paid for over decades. If they leave early, someone pays for it. This year the utilities and their regulators wrote that answer into contracts and tariffs, and the 10-Qs now carry it. The first post in this series read the builders' risk factors; this one reads the utilities.
How to read a utility filing for data-center load
Four places carry it:
- The revenue table by customer class (Dominion's "High load").
- The regulatory matters note. It describes each state proceeding by commission and month.
- The results release, furnished on Form 8-K, which carries the contracted gigawatts.
- The definitions. A pipeline is not a contract. AEP counts load as contracted only "if
backed by fully executed electric service agreements or letters of agreement" (8-K
0000004904-26-000069).
1. The load on file
| Utility | Line as filed | Filing |
|---|---|---|
| AEP | "With 15 gigawatts (GW) of new load commitments signed during the third quarter, AEP's incremental contracted load is expected to grow to 84 GW by 2031." | 8-K 0000004904-26-000069 |
| AEP Texas | Letters of agreement "for approximately 49 gigawatts of incremental load by 2031" | 10-Q 0000004904-26-000072 |
| Southern Company | contracts "covering approximately 16 GWs of electric load", reviewed by the state commissions, plus "approximately four GWs" awaiting review | 10-Q 0000092122-26-000069 |
| PPL (Pennsylvania) | "approximately 35.3 GW in advanced stages of planning, including 11.4 GW under signed electric service agreements and 8.5 GW under construction" | 8-K 0000922224-26-000050 |
| Dominion (Virginia) | High-load revenue $706 million in the quarter, $2,156 million in nine months, against $1,308 million | 10-Q 0001193125-26-440697 |
| Duke | "Demand associated with data center development remains a significant contributor to projected load growth." No gigawatt figure for it. | 10-Q 0001326160-26-000051 |
(Ours: PPL's signed share of its Pennsylvania pipeline is about 32%, 11.4 of 35.3 GW.)
2. The contract terms that move the cost onto the data center
AEP's 10-Q (0000004904-26-000072) gives the template: "Approved and proposed provisions may
include contract periods of up to 20 years, take-or-pay minimums covering 80% to 90% of
contracted demand, credit support and customer responsibility for specified infrastructure
costs."
Southern (0000092122-26-000069): "All of the Large Load Contracts contain minimum bill
provisions." About 16 gigawatts of them, "including substantially all signed after 2024", also
carry "minimum duration, termination payment requirements, and financial security requiring
customers to post collateral or provide an acceptable guarantee based on the customer's credit
ratings."
Duke's 8-K of 17 November (0001104659-26-128747) adds North Carolina. The state commission's
orders of 16 November "establish a DC Schedule applicable to certain data center customers", and
Duke is "still assessing that portion of the Orders". Its fact sheet (Exhibit 99.1) lists
"Minimum 15-year contract terms for data centers >100 MW", "Minimum billing demand of 75% of
contract demand", "Liquidated damages for early termination" and "A stranded generation charge
requiring security posting and additional payment at the end expiration of the contract term".
The state orders behind those sentences are reported, from the commissions' own records:
| State | Order | Terms (quoted) |
|---|---|---|
| Virginia | SCC final order, Case PUR-2025-00058, 25 Nov 2025 (SCC) | new GS-5 class at "25 megawatts ("MW") or greater"; "The contract term shall be 14 years"; minimums of 85% of contracted demand for distribution, 85% for transmission and 60% for generation; collateral of "$1.5 million/MW", reducible up to 70% on credit; effective 1 January 2027 |
| Ohio | PUCO Case 24-508-EL-ATA, July 2025 (PUCO; Consumers' Counsel) | data centers pay "for at least 85 percent of the electricity capacity they contract for, for up to 12 years, even if they use less"; collateral and exit fees; under appeal at the Supreme Court of Ohio |
| Indiana | IURC Cause No. 46097, order 19 Feb 2025 (IURC) | initial term "not less than 12 years"; billing demand at least "80 percent" of contract capacity |
| Georgia | PSC large-load rule, 23 Jan 2025 (PSC) | customers above 100 MW billed on separate terms; "longer contract lengths (from 5-year contracts to 15-year contracts) and minimum billing requirements" |
| Wisconsin | PSC, We Energies very-large-customer tariff, 24 Apr 2026 (PSC) | minimum initial term "15 years"; threshold lowered from 500 MW to 100 MW; a capacity-only option at 75% removed, "requiring the VLCs to pay 100% of their costs" |
| Oregon | PUC, Docket UM 2377 (PUC) | new Schedule 96 and "a 1- cent per kilowatt-hour surcharge for Schedule 96 customers with 100 megawatts or more"; the revenue supports residential programs |
(Ours: on the Virginia collateral figure, a 100 MW campus posts $150 million before any credit reduction.)
3. What the other customers are promised
The tariff terms come with promises to everyone else, and these are filed too.
- AEP (8-K
0000004904-26-000069): take-or-pay agreements in its vertically integrated states "are now expected to generate up to $21 billion in fixed cost offsets, increased from $16 billion, for existing residential customers over the life of the contracts." - Georgia Power (Southern 10-Q
0000092122-26-000069): on 26 August 2026 it agreed with the commission staff to raise "the amount of downward pressure on rates for non-large load customers to be included in its next base rate case to at least $949 million per year, on a levelized basis, for the years 2029, 2030, and 2031". It "will not seek recovery from non-large load customers for any revenue deficiency associated with serving large load data center customers in the event of an early contract termination." - Dominion and NextEra (Dominion 10-Q
0001193125-26-440697), in their merger case in Virginia: a September proposal "would extend the customer rate credits for residential customers to four years through the elimination of rate credits for certain large load customers and an additional approximately $90 million of shareholder funding." - PPL Electric (10-Q
0000922224-26-000052): the new large-load rate class "would provide $11 million in support for PPL Electric's residential low-income program." - Duke (
0001326160-26-000051): an October settlement in North Carolina covers "cost responsibility provisions applicable to qualifying large-load customers entering into electric service agreements on or after June 1, 2026". At the 10-Q the order was "expected in November 2026". The orders of 16 November approved the rate case settlements "except the Stipulation of Settlement on Large Load Tariff" and set the DC Schedule in its place (8-K0001104659-26-128747, Exhibit 99.1).
4. Power plants built for one customer
Entergy's 10-Q (0000065984-26-000325) has the clearest case. In March 2026 Entergy Louisiana
signed an electric service agreement with Evest LLC, "a subsidiary of Meta Platforms, Inc.", for
"a second new data center to be developed by Evest in north Louisiana". It asked the Louisiana
commission to certify "seven new combined cycle combustion turbine generation resources totaling
5,278 MW at a total cost of approximately $12.9 billion". Evest's obligations are "secured by
various forms of collateral, including a guaranty from Meta Platforms, Inc." On a separate plant,
the commission staff argues that its costs "should be borne by these customers in particular, not
Entergy Louisiana's customers generally."
The first Meta approval is reported in the commission's transcript of 20 August 2025, Docket U-37425 (LPSC): three turbines "totaling 2,262 megawatts", approved "four to one". Entergy's witness told the commission that "Meta's minimum bill will cover 100% of the cost of the three new generators and that includes any cost overruns". A researcher for the Deep South Center for Environmental Justice told the commission that after the 15-year contract the generators "will only be half paid for". A speaker for the deal, "as a utility planner", described the same plants as "half paid for generators that we can use to replace the aging fleet".
In Arkansas the commission drew a line. Entergy's 10-Q says it approved Google's special rate contract for West Memphis "but denying the requested ratemaking treatment of Google's upfront payments".
5. Getting in the queue
Texas. AEP's 10-Q (0000004904-26-000072) gives the rule and the pause. The Public Utility
Commission's new standards require a large load "to execute an intermediate agreement, provide
certain disclosures and post financial security in the amount of $50,000 per MW before inclusion
in an ERCOT interconnection study". AEP Texas received "approximately $2 billion of financial
security" for "45 gigawatts of prospective load" seeking ERCOT's Batch Zero. In August the
Governor directed a verification of all Batch Zero loads and "an audit of data center projects 25
MW and above", and "ERCOT has currently paused Batch Zero classification and study activity and
stated it will not authorize large loads to energize until verification is complete." (Ours: $2
billion over 45 gigawatts is about $44,000 per megawatt.)
PJM, the grid from Illinois to Virginia. AEP's 10-Q: "In October 2026, the FERC accepted PJM's definition of Large Load and its Large Load Registry, effective October 12, 2026". The capacity bill behind the fight is reported by PJM. Its 2027/2028 auction cleared "at the FERC-approved cap, $333.44/MW-day", and of the 5,250 MW rise in forecast peak load, "Nearly 5,100 MW of that increase is attributable to data center demand" (PJM, December 2025).
FERC. In June 2026 it gave each grid operator "60 days to either justify why their current tariffs remain just and reasonable without provisions tailored to large loads, or to file tariff changes" (reported, FERC).
6. When the data center pays for the plant itself
The other route skips the tariff: the buyer signs for a specific plant for 20 years.
- Vistra (10-Q
0001692819-26-000025): 20-year agreements to supply Meta "a total of 2,609 MW of carbon-free power and capacity" from its PJM nuclear plants. - Constellation (8-K
0001868275-26-000116): "a 20-year, 690 MW PPA with Amazon", and a 20-year agreement with Google "that will enable more than $4.3 billion in investment across 11 of our nuclear units" for about 890 MW. - NextEra (8-K
0000753308-26-000077): "three federal hub projects… totaling approximately 16.5 GW", which it "expects to develop, build and operate… for fees without investing capital."
What the filings do not say
- No contracted data-center gigawatts from Dominion or Duke. Dominion files high-load revenue; Duke says it is "increasing contracted capacity" without a number.
- No utility sizes the cost if a large customer leaves after its term ends. The contracts run 12 to 20 years and the plants run longer. Duke's new stranded generation charge is the closest answer on file, and its fact sheet leaves the formula to "a methodology to be determined in the future". The public comment in Louisiana is the only record we found that puts the question in numbers.
Filed this week
The last seven days of 8-Ks from these utilities:
- Dominion, 16 November, Item 8.01: an underwriting agreement for "$600,000,000 aggregate
principal amount" of 5.25% Senior Notes due 2029 and the same amount of 5.95% Senior Notes due
2037 (
0001193125-26-462496). - Vistra, 16 November, Item 7.01: an annual tax receivable agreement payment "with an aggregate
value of $91,056", to be paid on 30 November (
0001140361-26-044139). - Duke, 17 November, Item 8.01: the North Carolina orders above; DEC and DEP "expect to record
one-time pre-tax accounting charges of $10 million each" (
0001104659-26-128747). - Southern, 17 November, Item 8.01: it "completed its offering of the 40,000,000 Corporate Units",
each with "a stated amount of $50" (
0000092122-26-000082). - Duke, 19 November, Item 8.01: the sale of "$875,000,000 aggregate principal amount" of 6.05%
Senior Notes due 2036 (
0001104659-26-130154). - Dominion, 20 November, Item 8.01: the Hart-Scott-Rodino waiting period for its "previously
disclosed combination with NextEra Energy, Inc., expired" on 18 November
(
0001193125-26-469339).
Run it yourself
Open a utility's latest 10-Q and search for "large load", "minimum bill" and "take-or-pay". Then open its results release and find how it defines contracted load. Our Thesis Monitor reads each new filing against the lines you write down. In an agent, the filings are on the EvidInvest MCP server. It is free to start, credit packs from $10, and there is no subscription.
The gigawatts are signed in one filing and paid for in another. Read the contract terms.
Sources. AEP Form 8-K of 28 October 2026, Exhibit 99.1: 0000004904-26-000069; Form 10-Q for
the quarter ended 30 September 2026: 0000004904-26-000072. Southern Company Form 10-Q:
0000092122-26-000069; Form 8-K of 17 November 2026: 0000092122-26-000082. Dominion Energy Form 10-Q: 0001193125-26-440697; Forms 8-K of 16 and 20 November 2026:
0001193125-26-462496, 0001193125-26-469339. Entergy Form 10-Q:
0000065984-26-000325. PPL Form 8-K of 6 November 2026, Exhibit 99.1: 0000922224-26-000050;
Form 10-Q: 0000922224-26-000052. Duke Energy Form 10-Q: 0001326160-26-000051; Forms 8-K of 17 November 2026 (Exhibit 99.1)
and 19 November 2026: 0001104659-26-128747, 0001104659-26-130154. Vistra Form
10-Q: 0001692819-26-000025; Form 8-K of 16 November 2026: 0001140361-26-044139. Constellation Form 8-K of 9 November 2026, Exhibit 99.1:
0001868275-26-000116. NextEra Energy Form 8-K of 21 October
2026, Exhibit 99: 0000753308-26-000077. All 10-Qs are for the quarter ended 30 September 2026.
Reported (not SEC filings): Virginia SCC Case PUR-2025-00058; PUCO Case 24-508-EL-ATA and the
Ohio Consumers' Counsel case page; IURC Cause No. 46097; Georgia PSC (23 January 2025); Wisconsin
PSC (24 April 2026); Oregon PUC UM 2377; Louisiana PSC transcript of 20 August 2025 (U-37425);
PJM auction release (December 2025); FERC (18 June 2026); links in the text. Sources
were read on 15 November 2026; EDGAR was re-checked on 22 November 2026. No analyst estimate, consensus figure, share price or price target
appears on this page. Research, not investment advice.
Working with this data from an AI agent? The EvidInvest MCP server gives Claude, Cursor, and any MCP client access to 46 financial data, valuation, and SEC intelligence tools.
Fair Value Weekly
Get DCF breakdowns, fair value updates, and portfolio ideas for serious investors. No spam, no paywalled teasers.